Trijet Mining Corp. Completes First Hole of Phase II Drilling at Letourneur

Tuesday, 08 March 2011 09:04 AM

March 8, 2011, Vancouver, British Columbia: Trijet Mining Corp. (“Trijet’ or the “Company”) (TJT.V, TRJTF.PK) announces that the Company has been informed by its Senior Geologist, Michel Boily, Ph D., P. Geo., that the first drill hole of the Company’s Phase II drill program at the Letourneur gold project has been completed to a depth of 180 meters and drilling of the second hole has commenced.

The Letourneur project is located in the prolific gold producing Abitibi region of southwestern Quebec, 41 km north of Rouyn-Noranda, in the regional municipality of Taschereau, Privat Township. Subsequent to the additional staking of claims, the property now consists of 80 mineral claims (polygons) for a total area of approximately 4,300 hectares (10,600 acres). The property is underlain by Archean volcanic rocks of the Hunter Mine Group in the Abitibi Greenstone Belt. The stratigraphic column is dominated by massive to pillowed andesitic tholeiitic lavas, mafic tuffs and iron formations overlying a sequence of calco-alcaline andesitic to dacitic lavas and tuffs.

As reported by the Company on September 28, 2010, the Phase I drilling campaign, completed in the summer 2010, consisted of 15 drill holes of which 10 holes intersected gold bearing mineralization. Here is a summary of the best intersections from Phase I:

- Drill-hole LE 2010-11 intersected at shallow depth 16 meters of 1.33g/t Au from 17.2m to 33.2m, including 4.2m of 4.7g/t (0.15oz/t)Au from 17.20m to
21.40 m.

-Drill-hole LE 2010-10 intersected high grade gold of 16.82 g/t (0.6 oz/t) Au over 1.90 meters from 40.45m to 42.35m.

 

The Phase II drill program will consist of 4,000 meters, including several holes in the vicinity of the best intersections cited above. The first 14 holes of will be aligned parallel to and situated on the northern side of the Lois Lake fault which defines a structural boundary between the mafic tholeiitic and felsic calco-alcaline volcanic assemblages. The fault extends along an ENE-WSW direction for 3.3 kilometers.

 

A Technical Report on the Letourneur project is available on the Company website at http://www.trijetmining.com/Letourneur%20Property%20Summary.pdf. Michel Boily, a

 

 

“Qualified Person” has reviewed the technical aspects of this release. For more information please call 604-669-4367 or MI3 Financial Communications Inc. at 514-904-1333.

 

On behalf of the Board,

“Paul Shatzko”

 

Paul Shatzko

President

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.