Trijet Mining Corp Signs Letourneur Drilling Contract
Friday, 11 February 2011 09:17 AM
Vancouver British Columbia, February 11, 2011, Trijet Mining Corp. (“Trijet” or the “Company”) (TSX.V: TJT, TRJTF.PK) announces it has received a signed contract from Foramex Drilling (the “Contractor”) of Rouyn Noranda Quebec to drill Phase II of the Letourneur gold project located approximately 40 kilometers (25 miles) north of Rouyn Noranda in the Abitibi Greenstone Belt of Western Quebec.
Under the terms of the contract, the Contractor undertakes to drill NQ-sized drill holes into overburden and bedrock for a total length of 4000 meters. The Company guarantees to have the Contractor drill a minimum total length of 4000 meters. Drill holes shall attain at least 100 meters deep and maximum 700 meters deep. At the Company’s request and depending on the field conditions, the drill holes can be extended to a depth of 1000 meters. The Contractor shall drill at least 60 meters per day.
The anticipated start date of the program is February 28, 2011. As well, the Company has requested a second drill rig be commissioned subject to availability. Trijet’s President, Paul Shatzko states: “The Company hopes to have a second drill on the property to accelerate the program since the tight schedule of drilling contractors in Quebec has put the project one month behind schedule”
The Company will release results of the drill program as they become available. In Phase I of the Letourneur project (summer 2010) the Company completed 15 drill holes for a total of 2190 meters encountering gold mineralization in 10 holes including 16 meters of 1.33g/t Au (with 4.2 m of 4.7g/t Au near surface) and 1.9 meters of 16.8 g/t Au (see September 28, 2010 press release).
Michel Boily, PhD, P Geo and a “Qualified Person” has reviewed the technical aspects of this release.
For more information contact Trijet Mining Corp. at 604-669-4367 or visit our website at www.trijetmining.com.
On behalf of the Board,
“Paul Shatzko”
Paul Shatzko
President
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
