Transeuro Energy Corp. Updates May Production

Thursday, 05 July 2012 09:10 AM

Calgary, Canada: - Transeuro Energy Corp. ("Transeuro" or the "Company") announces that June gas production from the Beaver River field in Canada was 1,723,950m3 (average of 57,465m3 per day or 2.0 mmcf/d), compared to May production of 1,941,070m3 (average of 62,615 m3 per day or 2.2 mmcf/d).

The previously announced summer programme at Beaver River is delayed due to heavy rains throughout the spring that have prevented barging operations and have restricted road and bridge access throughout the area. Once barging resumes the Company will complete repairs on the access roads and assess if sufficient time remains to complete a summer programme or if the planned well re-entry, acidizing and fracking operations will be delayed until the winter.

ABOUT THE COMPANY

Transeuro is involved in the acquisition of petroleum and natural gas rights, the exploration for, and development and production of crude oil, condensate and natural gas. The Company owns 100% of a gas producing property located in British Columbia, Canada and has interest in gas exploration and appraisal developments in Crimea, Ukraine.

On behalf of the Board of Directors

Aage Thoen, Chairman

For further information contact: Darren Moulds, IR, +1 403 705 1919

Karen Jenssen, IR, +47 91729787

http://www.transeuroenergy.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Oslo Axess accepts responsibility for the adequacy or accuracy of this release. The statements contained in this release that are not historical facts are forward-looking statements, which involve risks and uncertainties that could cause actual results to differ materially from the targeted results. The Company relies upon litigation protection for forward looking statements.

This press release contains "forward-looking information" which may include, but is not limited to, statements with respect to our operations. Such forward-looking statements reflect our current views with respect to future events and are subject to certain risks, uncertainties and assumptions. See our Annual Information Form for a description of risks and uncertainties relevant to our business, including our exploration and development activities. Test production rates may vary from sustained production rates when developing a well or a deposit. The commerciality of any discovery can be affected by many factors including product prices, operating costs, capital costs, government take and sustained production levels and ultimate recovery of hydrocarbons. Hydrocarbon indications from drilling or wireline log data do not necessarily mean that mobile hydrocarbons are present in the formation or can be produced.