Transeuro Energy Corp. November Production & Compression Installation
Wednesday, 07 December 2011 01:30 PM
Vancouver, Canada: - Transeuro Energy Corp. ("Transeuro" or the "Company") announces that November gas production from the Beaver River field in Canada was 2,275,270m3 (75,842m3 per day or 2.7 mmcf/d). Average daily gas production since the Company took over as Operator compared to the same period last year is as follows:
------------------------------------------------------------------- | |2011 Average |2010 Average Daily Field Production| | |Daily Field | | | |Production | | |-----------------------------------------------------------------| | |m3/day |mmcf/day |m3/day |mmcf/day | |-----------------------------------------------------------------| |June|49,967 |1.6 |27,017 |0.9 | |-----------------------------------------------------------------| |July|65,124 |2.3 |20,307 |0.7 | |-----------------------------------------------------------------| |Aug |42,339 |1.5 |42,435 |1.5 | |-----------------------------------------------------------------| |Sept|73,757 |2.6 |74,629 |2.6 | |-----------------------------------------------------------------| |Oct |59,247 |2.1 |22,542 |0.8 | |-----------------------------------------------------------------| |Nov |75,842 |2.7 |21,992 |0.8 | |-----------------------------------------------------------------| |Dec |75,000 target|2.7 target|20,234 |0.7 | -------------------------------------------------------------------
The first phase of wellhead compression on A-2 was on line in September. The second phase of compression upgrades came on line on November 9th with the start up of a more powerful boost compressor allowing the gathering system throughout the field to operate at a lower pressure. Despite production trebling, the target of 100,000m3/day was not achieved due to an increase in water production in wells A-2 and A-5 coincident with lowering the flowing pressures. The water rate does appear to be dropping with time while gas rate is stable and the trends will be monitored over the next couple of months. Also the boost compressor is not performing to its rated output. The compressor had been shut down at another location in the field for the last 5 years and an overhaul of the boost compressor will be planned for next year to allow the gathering system to operate at an even lower pressure.
The Company is preparing an independent resource report for year end, to better quantify the shale potential at Beaver River and the performance of the wells at these lower pressures is an important contribution to understanding the reservoirs.
ABOUT THE COMPANY
Transeuro is involved in the acquisition of petroleum and natural gas rights, the exploration for, and development and production of crude oil, condensate and natural gas. The Company owns 100% of a gas producing property located in British Columbia, Canada and has interest in gas exploration and appraisal developments in Crimea, Ukraine. In addition, the Company holds a back-in option to Eaglewood Energy Inc.'s exploration licenses in Papua New Guinea.
On behalf of the Board of Directors
Aage Thoen, Chairman
For further information contact: Chris McGillivray, IR, +1 604 681 3939
Karen Jenssen, IR, +47 91729787
http://www.transeuroenergy.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Oslo Axess accepts responsibility for the adequacy or accuracy of this release. The statements contained in this release that are not historical facts are forward-looking statements, which involve risks and uncertainties that could cause actual results to differ materially from the targeted results. The Company relies upon litigation protection for forward looking statements.
This press release contains "forward-looking information" which may include, but is not limited to, statements with respect to our operations. Such forward-looking statements reflect our current views with respect to future events and are subject to certain risks, uncertainties and assumptions. See our Annual Information Form for a description of risks and uncertainties relevant to our business, including our exploration and development activities. Test production rates may vary from sustained production rates when developing a well or a deposit. The commerciality of any discovery can be affected by many factors including product prices, operating costs, capital costs, government take and sustained production levels and ultimate recovery of hydrocarbons. Hydrocarbon indications from drilling or wireline log data do not necessarily mean that mobile hydrocarbons are present in the formation or can be produced.
