Silver Hart Mine TM Trench Sample Results / Closing of 3,900,000 Flow-Through Private Placement

Wednesday, 06 October 2010 09:30 AM

Vancouver, B.C.: CMC Metals Ltd. (the “Company”) is pleased to provide an update on the Silver Hart Mine trench sampling in the TM zone. The purpose of the trench sampling was to evaluate grades and widths of the main vein structure over the length of the surface for future bulk sampling. Sample locations occurred every 10 meters. A total of 160 meters of strike length was sampled in the TM pit. The following are the assays at each trench location:

 

Sample               Width        Silver                  Silver               Lead          Copper      Zinc

Location             Meters       Grams/Tonne      Ounces/Ton     Percent      Percent      Percent

 

TR10-01-01        0.095          678                   19.8                 2.18         0.057         0.139

TR10-01-02        0.550         1805                   52.6                 4.13         0.161         0.744

TR10-01-03        0.270             27                     0.8                 0.177       0.016         0.086

 

TR10-02-01        0.130          188                      5.5                 4.04         0.041         0.149

TR10-02-02        0.290             84                      2.4                 0.445       0.015         0.134

TR10-02-03        0.570         1895                   55.3                 4.78         0.276         0.636

 

TR10-03-01        0.690         3010                   87.8                 5.43         0.349         0.574

 

TR10-04-01        0.300         1810                   52.8                16.5           0.373         0.343

 

TR10-05-01        0.300             43                    1.3                  0.154       0.028         5.36

TR10-05-02        0.900          173                    5.0                  0.582       0.067         0.394

TR10-05-03        0.330         >10000               >291.7             16.6           0.556         0.834

 

TR10-06-01        0.260         5600                   163.3                4.09         0.769         0.637

TR10-06-02        0.230          406                    11.8                1.385       0.134         0.322

TR10-06-03        0.270         2240                    65.3               17.1           0.219         0.372

 

TR10-07-01        0.270         3010                   87.8                7.03          0.112         0.214

 

TR10-08-01        0.290         5630                   164.2               >20.0         0.238         0.277

 

TR10-09-01        0.130         1590                    46.4               5.81          0.14           0.318

TR10-09-02        0.090         >10000               >291.7             4.18          0.482         1.875

TR10-09-03        0.090         1380                   40.2                8.77          0.162         0.28

 

TR10-10-01        0.120          182                    5.3                 1.82          0.076         0.206

TR10-10-02        0.090         1795                   52.4                7.59          0.094         0.2

TR10-10-03        0.200         4210                   122.8               >20.0         0.489         0.232

 

TR10-11-01        0.210         4490                   131.0                4.42         0.269         0.15

TR10-11-02        0.160         >10000               >291.7             18.85         3.72           1.2

TR10-11-03        1.380         1950                   56.9                 9.87         0.365         0.149

TR10-11-04        0.200          498                    14.5                1.625       0.227         0.247

TR10-11-05        0.260         8930                   260.5               >20.0         0.866         3.82

 

TR10-12-01        0.300         >10000               >291.7             >20.0         2.04           6.26

TR10-12-02        0.980          918                    26.8                3.46         0.142         0.826

TR10-12-03        0.340         4590                   133.9               >20.0         0.59           9.29

 

TR10-13-01        0.110         2470                    72.0               12.6           0.115         0.459

TR10-13-02        0.180         3740                   109.1               15              0.208         0.472

TR10-13-03        0.140          186                       5.4                0.496       0.024         0.359

TR10-13-04        0.420         >10000               >291.7             >20.0         0.983         0.418

 

TR10-14-01        0.210         1070                    31.2                1.795       0.132         0.233

TR10-14-02        0.540         7800                   227.5               >20.0         0.684         0.442

TR10-14-03        0.180          665                    19.4                2.16         0.083         0.151

 

TR10-15-01        0.400          159                     4.6                 0.105       0.227         0.176

TR10-15-02        0.160          808                   23.6                 0.64         0.34           0.258

TR10-15-03        0.300         >10000               >291.7             13.05         1.505         0.567

TR10-15-04        0.210          227                      6.6                 1.005       0.111         0.884

TR10-15-05        0.420         1530                   44.6                 1.125       0.284         1.025

 

TR10-16-01        0.300         3150                   91.90              17.6           0.397         0.558

 

Samples were prepared and assayed by ALS Laboratory Group in Vancouver, an ISO qualified assay facility. Silver values were determined using fire assay method with gravimetric finish. All other assays were by 4AR-ICP method. Sample width is horizontal width and doesn’t account for structural dip. Estimated structure dip is 75 degrees or a true width factor of 0.97.

 

The data from the trench sampling program will be modeled with the current and past drill data to evaluate the potential of taking larger 5000 tonne bulk samples from the TM pit area, during the permitting review. The current 200 tonne bulk sample taken this year was a logistical and metallurgical recovery test for potential larger bulk samples.

 

The Company further wishes to announce that it has closed its flow-thru private placement at $0.15 per Unit as announced by press release dated June 28, 2010, the terms of which were amended by press releases dated July 9, 2010 and September 15, 2010, raising gross proceeds of $459,675 and issuing a total of 3,902,667 flow-through common shares to its placees at $0.15 per share, and issuing Warrant Certificates for 3,902,667 Warrant Shares. The terms of the exercise of the Share Purchase Warrants are that every two Warrants are exercisable into one “flow-through” common share at $0.20 per share expiring September 23, 2011, resulting in the further issuance of 1,951,333 common shares should all the Warrant Shares be exercised pursuant to this placement, as amended. All funds raised pursuant to this placement were used to pay for the work program on the Company’s properties both in British Columbia and the Yukon. Finders’ fees will be paid to arms-length parties to the Company by way of cash equal to the percentage of funds raised by those parties, representing approximately 3.9% of the total gross proceeds raised.

 

In compliance with NI 43-101, Don Wedman, P.Eng., President and Chief Executive Officer of the Company, is the Qualified Person who prepared or supervised the preparation of the technical information presented in this news release.

This news release was prepared on behalf of the Board of Directors, which accepts full responsibility for its contents.

                                                                                    On behalf of the Board:

           

“Donald W. Wedman”         

Donald W. Wedman, P.Eng.

CMC METALS LTD.

 

 

For further information on the Company, please contact Mr. Gord Zelko, VP Business Relations at MineralStocks Consulting Services. Telephone: 250-495-7123, or Email:  [email protected].

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.