Rye Patch Gold Drills 45.7 Metres Grading 1.58 g/t Au at Jessup
Wednesday, 22 October 2008 09:17 AM
------------------------------------------------------------------
TABLE 1: JESSUP PROJECT - SIGNIFICANT 2008 REVERSE CIRCULATION
DRILL PROGRAM RESULTS
------------------------------------------------------------------
Hole
inter- Total
Au Ag val From To Depth
Drillhole Target g/t g/t m m m (metres)
------------------------------------------------------------------
JR-08-002 San Jascinto 0.65 1.81 12.2 25.9 38.1
---------------------------------------------------------
JR-08-002 San Jascinto 1.58 20.57 45.7 42.7 88.4
---------------------------------------------------------
Including 5.86 20.57 3.0 62.5 65.5 243.9
---------------------------------------------------------
Including 3.70 123.44 4.6 73.2 77.7
---------------------------------------------------------
JR-08-002 San Jascinto 0.96 58.29 3.05 129.5 132.6
------------------------------------------------------------------
JR-08-003 San Jascinto 0.45 3.87 6.1 16.8 22.9 135.7
------------------------------------------------------------------
JR-08-004 San Jascinto 0.69 8.95 24.4 35.1 59.4 106.7
------------------------------------------------------------------
JR-08-005 San Jascinto 0.79 2.87 18.3 32.0 50.3 160.1
------------------------------------------------------------------
JR-08-006 San Jascinto 0.38 1.97 4.6 13.7 18.3 167.7
------------------------------------------------------------------
JR-08-009 Central Jessup 0.48 1.25 3.0 51.8 54.9 122.0
------------------------------------------------------------------
JR-08-012 San Jascinto 1.30 6.76 16.8 61.0 77.7
---------------------------------------------------------
JR-08-012 San Jascinto 0.93 74.72 13.7 83.8 97.5 152.4
---------------------------------------------------------
Including 1.68 172.99 4.6 88.4 93.0
------------------------------------------------------------------
JR-08-018 North Jessup 0.55 24.62 16.8 13.7 30.5 91.5
---------------------------------------------------------
JR-08-018 North Jessup 0.38 2.34 7.6 62.5 70.1
------------------------------------------------------------------
JR-08-023 North Jessup 1.47 9.02 6.1 18.3 24.4 91.5
---------------------------------------------------------
JR-08-023 North Jessup 0.48 7.00 18.3 30.5 48.8
------------------------------------------------------------------
JR-08-024 North Jessup 0.58 2.15 3.0 7.6 10.7 106.7
------------------------------------------------------------------
Drillholes JR-08-002, 003, 004, 005, and 012 show the San Jascinto deposit
is open to the northeast and along the southern margin of the deposit.
Additional drilling in these directions is warranted based on the results.
The gold and silver values are associated with strongly altered breccias
zones within the volcanic host rocks. The results indicate the San
Jascinto deposit has a high silver component to the mineralization.
These zones have potential to host high-grade gold and silver.
"Success is the word that describes Rye Patch's drilling campaigns on its three advanced-stage gold projects - Wilco, Jessup and Lincoln Hill," stated Rye Patch's CEO and President, William C. (Bill) Howald. "The Company's ability to report positive assay results week after week speaks volumes to the expertise of the Company's technical group, and the pledge of the management to create value for its investors."
Drilling on the Jessup project shows mineralisation is open in the San Jascinto, and North Jessup targets. Management anticipates an increase in the resource estimate based on this new drilling and plans to update the resource estimate in early 2009.
The drill programs are now complete at Wilco and Jessup while a drill rig is working at Lincoln Hill to follow up the recently released results of 21.3 metres grading 27.16 g/t gold including an interval of 7.6 metres grading 75.44 g/t gold. The Company will report additional drill results for Wilco, Jessup and Lincoln Hill projects through the end of the year.
As released on the Company's Wilco project on May 12, 2008, and on the Jessup project in December 11, 2007, Rye Patch Gold now holds 779,517 ounces of gold and gold equivalent in the measured and indicated category plus 1,151,776 ounces of gold and gold equivalent in the inferred category. The table below summarizes the resources for Rye Patch Gold's advance-stage projects.
--------------------------------------------------------------------------
Table 2: Rye Patch Gold's NI43-101 Gold Resource Inventory
--------------------------------------------------------------------------
Cont-
ained
Cont- Cont- Gold &
Gold Silver ained ained Gold
Resource Tons Grade Grade Gold Silver Equiv.
Property Category(1) (X 1,000) opt opt Ounces Ounces Ounces(3)
--------------------------------------------------------------------------
Wilco(2) Measured 8,091 0.018 NC 146,701 NC 146,701
Indicated 32,950 0.015 NC 478,816 NC 478,816
Inferred 99,978 0.011 NC 1,124,776 NC 1,124,776
--------------------------------------------------------------------------
Jessup(2) Measured 0 0 0 0 0 0
Indicated 5,423 0.022 0.31 120,000 1,655,000 154,000
Inferred 1,265 0.017 0.23 22,000 286,000 27,000
--------------------------------------------------------------------------
Total Measured Resources 146,701 0 146,701
Total Indicated Resources 598,816 1,655,000 632,816
Total Inferred Resources 1,146,776 286,000 1,151,776
--------------------------------------------------------------------------
(1) Conforms to 43-101 definitions for resources. All numbers are rounded.
(2) Cutoff grade for Willard Measured and Indicated resource is reported at
0.0056 opt Au for oxide mineralisation and 0.042 opt Au for sulphide
mineralisation. The Inferred resource is reported at 0.0056 opt Au for
oxide, sulphide and carbonaceous ore types; however, a higher opt Au
cut-off grade may be required to upgrade the inferred resource to the
measured and indicated resource category. Cutoff grade for Jessup is
0.01 oz Au/t for oxide mineralisation, 0.015 oz Au/t for mixed material,
and 0.025 oz Au/ton for all unoxidised material;
(3) Jessup Resource includes Au equivalent ounces (50 g/t Ag equals 1 g/t
Au). NC equals not calculated
He has verified the information and has reviewed and approved the contents of this news release.
Rye Patch Gold maintains a strict quality control program at all of its projects. ALS Chemex collects the Wilco, Lincoln Hill-Gold Ridge, and Jessup drill samples onsite and transports the samples directly to the ALS Chemex's preparation and analysis facility located in Reno, Nevada. Analyses are conducted on 1-assay ton prepped samples with gold determined using industry standard fire assay methods, with an atomic absorption finish.
Mr. Shea Clark-Smith is overseeing the gold assay and geochemical quality control and assurance programs for Rye Patch Gold's drill programs at Wilco, Jessup and Lincoln Hill. He is responsible for creating, administering, and monitoring sample preparation and analytical QA/QC procedures for the drilling program. In sum, the QA/QC procedures will provide several measures of data quality and assure the Company that the data is representative of the original sample.
Rye Patch Gold Corp. is a Nevada-focused and discovery-driven company building a sizeable inventory of gold resource assets in the mining friendly state of Nevada, USA. The Company's seasoned management team is engaged in acquisition, exploration and development of quality resource-based gold projects. Rye Patch Gold is developing its primary assets - the advanced-stage Wilco project located within the Humboldt Gold Trend in west-central Nevada and the Jessup project in Churchill County, Nevada. The Company is seeking gold opportunities that continue to create shareholder value and leverage the gold price. The Company's goal is to have 5-million ounces of gold inventory within the next 3 years. For more information about Rye Patch Gold, please visit our website at www.ryepatchgold.com.
On behalf of the Board of Directors
William C. (Bill) Howald, CEO & President
This news release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company's actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company's control. These factors include: the availability of funds; the timing and content of work programs; results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles; project cost overruns or unanticipated costs and expenses, fluctuations in metal prices; currency fluctuations; and general market and industry conditions.
Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.
SOURCE: Rye Patch Gold Corp.
Rye Patch Gold Corp.
Karen Robb
Manager, Investor Relations
(604) 638-1588
(604) 638-1589 (FAX)
Email: [email protected]
Website: www.ryepatchgold.com
Renmark Financial Communications Inc.
Christine Stewart
Senior Account Manager
(416) 644-2020
(416) 644-2021 (FAX)
Email: [email protected]
Website: www.renmarkfinancial.com
