
Orezone Resources Inc.: Drilling Identifies New Mineralized Zone at Bondi Gold Project
Monday, 05 February 2007 12:30 PM
The new mineralized zone (Zone 2NW) is approximately 225m long and has been drilled to a depth of 30m where it remains open (see Table 1 for summary). It is located about 80m West of Zone 2NE (previously Zone 2N). A follow up RC drill program will commence in February to further define the zone. Additional core drilling, to test down dip extensions, is planned for both zones later this season. Similar targets are suggested to the south of Zone 2NE by geophysics and will be tested in the next program.
Table 1 Zone Section Hole# From To Length(i) Grade -------------------------------------------------------------------- m m m g/t -------------------------------------------------------------------- 2NE 4550 BRC624 81.00 90.00 9.00 1.58 -------------------------------------------------------------------- 2NE 4450 BRC630 76.00 86.00 10.00 2.03 -------------------------------------------------------------------- 2NE 4450 BRC630 90.00 94.00 4.00 0.83 -------------------------------------------------------------------- 2NE 4450 BRC631 44.00 54.00 10.00 2.12 -------------------------------------------------------------------- 2NE 4425 BRC632 0.00 4.00 4.00 3.67 -------------------------------------------------------------------- 2NE 4425 BRC632 18.00 29.00 11.00 3.06 -------------------------------------------------------------------- 2NE 4425 BRC632 34.00 37.00 3.00 0.68 -------------------------------------------------------------------- 2NE 4425 BRC632 44.00 74.00 30.00 2.93 -------------------------------------------------------------------- 2NE 4375 BRC633 29.00 34.00 5.00 1.31 -------------------------------------------------------------------- 2NW 4450 BRC629 65.00 70.00 5.00 2.13 -------------------------------------------------------------------- 2NW 4400 BRC634 36.00 45.00 9.00 4.06 -------------------------------------------------------------------- 2NW 4350 BRC635 45.00 59.00 14.00 4.09 -------------------------------------------------------------------- 2NW 4350 BRC635 64.00 67.00 3.00 1.59 -------------------------------------------------------------------- 2NW 4325 BRC636 24.00 28.00 4.00 6.09 -------------------------------------------------------------------- 2NW 4325 BRC636 51.00 54.00 3.00 1.31 -------------------------------------------------------------------- 2NW 4300 BRC637 17.00 26.00 9.00 2.79 -------------------------------------------------------------------- 2NW 4300 BRC664 36.00 40.00 4.00 2.99 -------------------------------------------------------------------- 2NW 4300 BRC664 43.00 47.00 4.00 1.67 -------------------------------------------------------------------- 2NW 4275 BRC638 21.00 25.00 4.00 5.80 -------------------------------------------------------------------- 2NW 4275 BRC638 28.00 34.00 6.00 1.36 -------------------------------------------------------------------- (i) True widths are estimated to be 65% of the above down-hole intercepts.
"This project continues to grow at a steady pace and shows long term promise," stated Mr. Ron Little, President & CEO for Orezone. "The focus is to define several mineable zones at surface that can be exploited and processed via either heap leaching or a CIL plant. The Bondi Main structure is only 4km of a 57km NE trending corridor that hosts several mineralized zones. We remain optimistic about the potential of the Bondi extensions, analogous targets, and the remainder of the entire corridor under our control," continued Little.
Drilling on the Bondi Project property was supervised by Dr. Pascal Marquis, VP Exploration, who is a Qualified Person under National Instrument 43-101 and has reviewed and approved the technical information in this release. Samples were collected at a minimum of every 1m down the hole and they were analyzed using a 2kg bottle roll cyanide leach at the Abilab Laboratory in Ouagadougou, Burkina Faso, an internationally recognized laboratory. A minimum of 10% of the samples are for QA/QC, which includes random head assays, duplicates, standards and blanks, as well as tail assays on samples that returned at least 0.5 g/t.
Orezone is an emerging gold producer that has an exploration permit for Essakane, the largest gold deposit in Burkina Faso, West Africa where partner Gold Fields Limited is earning a 60 per cent interest by completing a bankable feasibility study. Orezone also has a pipeline of promising projects, all located in politically stable areas of West Africa which is one of the world's fastest growing gold producing regions. Orezone's mission is to create wealth by discovering and developing the earth's resources in an efficient and responsible manner.
FORWARD-LOOKING STATEMENTS: This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. Except for statements of historical fact relating to the company, certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, uncertainties relating to the availability and costs of financing needed in the future and other factors. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements.
