Massive Sulphides and High Grades Recorded Across Multiple Lenses
Friday, 17 August 2018 05:40 PM
Heron Resources Limited (ASX:HRR, TSX:HER) (“Heron” or the “Company”) is pleased to report further results from the 2014 drilling program at the Company’s 100%-owned Woodlawn Zinc-Copper Project in New South Wales. A number of additional massive sulphide intercepts have been recorded along with the receipt of high grade assays.
Heron Resources Managing Director, Wayne Taylor, provided the following comment on the current status of the drilling program: “The results received to date from drilling into Kate Lens have been simply outstanding. And now, to follow this up with a number of strong massive sulphide intercepts into other lenses reinforces our view that this VMS system has plenty more to offer to underpin a long life, high grade mining operation at Woodlawn. We look forward to providing the market with further updates as more results come to hand.”
Assay Results
Assay results for diamond hole WNDD0001, Kate Lens, have been received and as previously reported these results were awaiting final laboratory quality control checks prior to being released. Also received were the assays for reverse circulation (RC) drill hole WNRC0010, drilled into the up-dip position of the G Lens, which intersected some 8m of massive sulphides from 37m down-hole depth. Significant massive sulphide intercepts drilled and assayed to date are summarized below with full details of hole locations and intercepts provided in Tables 1 and 2 at the end of this report:
- WNDD0001: 14.4m grading 4.6% Zn, 4.1% Cu, 0.8% Pb, 1.0g/t Au and 57g/t Ag from 374m downhole;
- WNDD0002: 8.8m grading 12.6% Zn, 1.6% Cu, 7.5% Pb, 2.3g/t Au and 152g/t Ag from 374m downhole (previously reported);
- WNDD0002: 2.3m grading 12.0% Zn, 0.6% Cu, 5.4% Pb, 1.3g/t Au and 116g/t Ag from 368m downhole (previously reported);
- WNRC0010: 8.0m grading 3.6% Zn,1.3% Cu, 2.6% Pb, 1.0g/t Au and 65g/t Ag from 37m downhole.
The strong result from WNDD0001 demonstrates good continuity of the Kate lens in a northerly direction from WLTD015 and further drilling to the north and up-dip of this intercept is planned in the coming weeks.
The massive sulphide intercept in WNRC0010 demonstrates near surface potential and this result will be pursued in an effort to prove up mineralisation that can either be mined via an open-cut or from underground access.
New Intercepts
The current drilling program has been successful in intersecting significant Woodlawn style massive sulphides in multiple lenses including Kate, G, I and the new I2 Lenses. Significant intercepts recorded but not yet assayed include:
- WNDD0006: 5.0 metres of massive sulphides from 625.0 metres (I Lens)
- WNDD0006: 3.0 metres of massive sulphides from 664.1 metres (New Lens)
- WNDD0006: 9.8 metres of massive sulphides from 699.3 metres (New I2 Lens)
- WNDD0007: 13.3 metres from 413 metres (Kate Lens)(previously reported)
The results being returned by the current program at Woodlawn continue to support the discovery of significant new mineralisation from multiple lenses and provide for the opportunity to be sourcing production from a number of locations in a new mining operation.
Further updates to the current drilling program at the Woodlawn Zinc-Copper Project will be provided upon receipt of additional results.
Figure 1 Long-section looking east for the Kate Lens showing recent drilling and modelled DHEM plate
To view the graphic in its original size, please click here
Figure 2 Long section of the G Lens position
To view the graphic in its original size, please click here
About Heron Resources Limited:
Heron is engaged in the exploration and development of base and precious metal deposits in Australia. Heron’s projects include the high grade Woodlawn Zinc-Copper Project located 250km southwest of Sydney, New South Wales, and the Kalgoorlie Nickel Project located north of Kalgoorlie, Western Australia. In addition the Company holds a number of other high quality exploration properties located in the Lachlan Fold Belt, New South Wales.
For further information, please visit www.heronresources.com.au or contact:
Australia:
Mr Wayne Taylor, Managing Director and Chief Executive Officer:
Tel: +61 8 9215 4444
Email: [email protected]
Canada:
Tel: +1 905 727 8688 (Toronto)
Technical Information
Table 1 Drill hole details for diamond and reverse circulation drill holes drilled to date in current Heron campaign
|
Hole No |
WMG East (m) |
WMG North (m) |
WMG RL (m) |
Surface |
WMG Surface Azimuth |
Depth (m) |
Target |
|
WNDD0001 |
8,995 |
19,402 |
2,793 |
-65.0 |
88.0 |
425.5 |
Kate Lens |
|
WNDD0002 |
9,011 |
19,400 |
2,793 |
-58.2 |
95.1 |
434.5 |
Kate Lens |
|
WNDD0003 |
8,996 |
19,402 |
2,793 |
-71.1 |
88.8 |
463.2 |
Kate Lens |
|
WNDD0004 |
8,977 |
19,637 |
2,786 |
-70.4 |
86.0 |
272.5 |
I Lens (up-dip) |
|
WNDD0005 |
8,976 |
19,638 |
2,787 |
-65.3 |
78.7 |
263.6 |
I Lens (up-dip) |
|
WNDD0006 |
8,548 |
19,749 |
2,787 |
-70.0 |
96.8 |
720 (in progress) |
I/I2/D Lens (down-dip) |
|
WNDD0007 |
8,997 |
19,350 |
2,792 |
-60.0 |
91.0 |
580.6 |
Kate Lens |
|
WNRC0001 |
9,427 |
19,439 |
2,797 |
-62.04 |
90.1 |
138 |
A Lens |
|
WNRC0002 |
9,407 |
19,496 |
2,797 |
-62.013 |
65.17 |
150 |
A Lens |
|
WNRC0003 |
9,426 |
19,499 |
2,797 |
-66.395 |
89.17 |
108 |
A Lens |
|
WNRC0004 |
9,410 |
19,542 |
2,797 |
-61.063 |
94.67 |
132 |
A Lens |
|
WNRC0005 |
9,427 |
19,495 |
2,797 |
-76.47 |
97.43 |
12 |
Abandoned |
|
WNRC0006 |
8,989 |
19,638 |
2,786 |
-74.79 |
87.21 |
48 |
Abandoned |
|
WNRC0007 |
8,991 |
19,638 |
2,786 |
-74.5 |
86.488 |
11.5 |
Abandoned |
|
WNRC0008 |
9,992 |
19,736 |
2,781 |
-60 |
91.418 |
120 |
Office target |
|
WNRC0009 |
9,198 |
19,340 |
2,796 |
-61.704 |
90.16 |
138 |
G&E Lens (up-dip) |
|
WNRC0010 |
9,298 |
19,307 |
2,801 |
-62.602 |
89.26 |
168 |
G Lens (up-dip) |
|
WNRC0011 |
9,242 |
19,285 |
2,797 |
-62.405 |
93.78 |
121 |
G&E Lens (up-dip) |
Notes: WMG = Woodlawn Mine Grid
Table 2 Details of massive sulphide intercepts and reported grades from current Heron campaign
|
Hole No |
From (m) |
To (m) |
Downhole Width (m) |
Estimated True Width (m) |
Zn (%) |
Cu (%) |
Pb (% |
Au (g/t) |
Ag (g/t) |
|
WNDD0001 |
373.6 |
388.0 |
14.4 |
11.5 |
4.6 |
4.1 |
0.8 |
1.0 |
56.8 |
|
WNDD0002 |
368.0 |
370.3 |
2.3 |
1.9 |
12.0 |
0.6 |
5.4 |
1.3 |
116 |
|
WNDD0002 |
374.0 |
382.7 |
8.8 |
7.2 |
12.6 |
1.6 |
7.5 |
2.3 |
152 |
|
WNRC0010 |
37.0 |
45.0 |
8 |
6.4 |
3.6 |
1.3 |
2.6 |
1.0 |
65.4 |
Notes: True width is an estimate of the actual thickness of the intercept based on interpreted lens orientation; grades are weighted average grades, weighted by length of samples intervals downhole, which are nominally 1 metre. No weighting was applied for differences in specific gravity.
Compliance Statement (JORC 2012 and NI43-101)
The technical information in this news release relating to the exploration results at the Woodlawn Project is based on information compiled by Mr Rod Arnold, who is a Member of the Australian Institute of Geoscientists. Mr Arnold is a full time employee of Heron Resources Limited and has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results and “qualified person” as this term is defined in Canadian National Instrument 43-101 (“NI 43-101”). Mr Arnold has reviewed this press release and consents to the inclusion in this news release of the information in the form and context in which it appears.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements and forward-looking information within the meaning of applicable Canadian securities laws, which are based on expectations, estimates and projections as of the date of this news release. This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to management’s expectations with respect to, among other things, the timing and amount of funding required to execute the Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits, certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s properties, environmental risks, the availability of labour, the focus of the Company in the future, demand and market outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise funding privately or on a public market in the future, the Company’s future growth, results of operations, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and on information available to management at such time. Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results, performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These factors, including, but not limited to, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls, regulations, political or economic developments in Canada, Australia or other countries in which the Company does business or may carry on business in the future, operational or technical difficulties in connection with exploration or development activities, employee relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Prospective investors should not place undue reliance on any forward-looking information. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.
No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.
Appendix 1 – JORC 2012 Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section applies to all succeeding sections)
|
Criteria |
JORC Code explanation |
Commentary |
|---|---|---|
|
Sampling techniques |
|
|
|
Drilling techniques |
|
|
|
Drill sample recovery |
|
|
|
Logging |
|
|
|
Sub-sampling techniques and sample preparation |
|
|
|
Quality of assay data and laboratory tests |
|
|
|
Verification of sampling and assaying |
|
|
|
Location of data points |
|
|
|
Data spacing and distribution |
|
|
|
Orientation of data in relation to geological structure |
|
|
|
Sample security |
|
|
|
Audits or reviews |
|
|
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
|
Criteria |
JORC Code explanation |
Commentary |
|---|---|---|
|
Mineral tenement and land tenure status |
|
|
|
Exploration done by other parties |
|
|
|
Geology |
|
|
|
Drill hole Information |
|
|
|
Data aggregation methods |
|
|
|
Relationship between mineralization widths and intercept lengths |
|
|
|
Diagrams |
|
|
|
Balanced reporting |
|
|
|
Other substantive exploration data |
|
|
|
Further work |
|
|


