March 2017 Quarterly Report
Friday, 17 August 2018 05:40 PM
West African Resources Limited (ASX, TSX-V: WAF) is pleased to report activities on its 100%-owned gold projects in Burkina Faso, West Africa, for the quarter ending 31 March 2017.
Highlights
Sanbrado Gold Project
- Interim open-pit feasibility study confirms Sanbrado Gold Project as +150,000 ounces per annum gold producer with rapid capital payback, low-cost simple CIL process flowsheet
- 124% increase in Indicated Resources at M1 South, driving new project economics
- 103% increase in Probable Reserves now 894,000 ounces (16.8Mt at 1.7g/t Au)
- Outstanding drill results, post study release from M1 and M5 exceed expectations, confirms high grade mineralisation open at depth and underground potential at both M1 and M5
- Underground mining study in progress – higher grade underground mineralisation expected to displace low-grade in updated mining schedule resulting in a significant upgrade to project economics, without a material change to processing flowsheet and capital costs
- High-grade visible gold intercepted in multiple holes at M1, doubling depth of intercepted mineralisation, now more than 400m below surface
- Mining licence received from Government of Burkina Faso
- Drilling accelerated with 5 rigs on site double shifting, focus on adding value through the drill bit
- $14.5m cash at bank and $7.5m ‘in-the-money’ options – well funded for 2017 work programs
M5 drilling results exceed expectations
- 29m at 4.96 g/t Au from 128m, including 9m at 10.6 g/t Au (TAN17-DD094)
- 15m at 5.03 g/t Au from 256m, including 2m at 27.3 g/t Au (TAN17-DD097A)
- 20m at 3.34 g/t Au from 170m, including 2m at 16.5 g/t Au (TAN17-DD100)
- 42m at 3.89 g/t Au from 176m, including 14m at 5.41 g/t Au (TAN17-DD101)
- 77m at 5.30 g/t Au from 352m, including 27m at 12.26 g/t Au (TAN17-DD102)
M1 drilling confirms ultra-high-grade system still open at depth
- 4m at 54.46 g/t Au from 293m including 0.5m at 150.9 g/t Au (TAN17-DD104)
- 9.5m at 34.03 g/t Au from 295.5m including 3m at 105.41 g/t Au (TAN17-DD107)
- Visible gold logged 349-354m and 369-376m, assays pending (TAN17-DD109)
- Visible gold logged 380-395m, assays pending (TAN17-DD110A)
- Visible gold logged 412-420m and 463-466m, assays pending (TAN17-DD111)
Managing Director Richard Hyde commented:
“The 2017 March quarter was transformational for the Company with the completion of an interim open-pit feasibility study and deep drilling results exceeding expectations at M1 and M5.
“The interim open-pit feasibility demonstrated Sanbrado as a high margin +150,000oz gold producer over the early years of the project, rapidly paying back capital in 2 years, with excellent metallurgy allowing simple CIL processing. A number of areas for improvement were highlighted which are being addressed in an underground optimisation study, along with an aggressive drilling program creating further value.
“TAN17-DD102 drilled during the quarter was a game-changer for M5 returning 77m at 5.3 g/t Au from 352m, more than 140m beneath the current $1,200 reserve pit shell. This confirms a second potential high grade underground feed source for the project, and in combination with M1 high grade, is expected to materially upgrade the project mine schedule, without any material changes to the CIL processing flowsheet or associated capital costs.
“Diamond drilling also recommenced at M1 during the March quarter, with five of the first six holes hitting high gold grades and visible gold, doubling the depth of known gold mineralisation. TAN17-DD104 and TAN17-DD107 were highlights returning 4m at 54.46 g/t Au and 3m at 105.41 g/t Au, respectively. Further high-grade results are expected shortly.
“The WAF team is focused on adding further value through targeted drilling over the coming months, with two additional contract rigs mobilised to site during the quarter. The Company is well-funded to carry out 2017 work programs.”
Click here to view the full Quarterly Activities Report