West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold projects in Burkina Faso, West Africa, for the quarter ending 30 June 2016.
Highlights
Tanlouka Gold Project
M1 South Prospect
- RC and diamond drilling intercept visible gold mineralisation in a number of holes
- Drilling completed over 350m of strike
- Results included:
- 6m at 9.2g/t Au from 15m, including 1m at 49.5g/t Au
- 4m at 6.19g/t Au from 59m, including 2m at 10.36g/t Au
- 18m at 82.28g/t Au from 98m, including 1m at 1107.5g/t Au
- 4m at 43.16g/t Au from 174m, including 1m at 169.7g/t Au
M1 North Prospect
- RC drilling returns 9m at 9.7g/t Au from 112m, incl. 1m at 61.7g/t Au
- Diamond core twin holes to verify RC sampling and provide bulk density confirmed the grade and tenor of M1 North oxide mineralisation with results of
- 12m at 2.62g/t Au from 23m and
- 12m at 2.36g/t Au from 21m
Feasibility Study
- Progress made on Permitting, Metallurgical Test Work, Mineral Resources and Location of Key Infrastructure
Corporate
- $12.5 million placement completed to accelerate drilling program and maiden resource estimation
June 2016 Quarter Summary
- 6,130 meters drilled (54 holes)
- $1.38m Exploration and Development Expenditure
- $0.34m Administration Costs
- $11.4 cash at bank at 30 June 2016
September 2016 Quarter Plans
- RC and Diamond drilling at M1 and M5
- Resource update M1, M3 and M5
- Feasibility study work
Click here for the full June 2016 Quarterly Activities Report