West African Resources Limited (ASX: WAF) is pleased to report activities on its 100%-owned gold projects in Burkina Faso, West Africa, for the quarter ending 30 June 2016.

 

Highlights

Tanlouka Gold Project

M1 South Prospect

 

  • RC and diamond drilling intercept visible gold mineralisation in a number of holes

 

  • Drilling completed over 350m of strike

 

  • Results included:


- 6m at 9.2g/t Au from 15m, including 1m at 49.5g/t Au


- 4m at 6.19g/t Au from 59m, including 2m at 10.36g/t Au


- 18m at 82.28g/t Au from 98m, including 1m at 1107.5g/t Au


- 4m at 43.16g/t Au from 174m, including 1m at 169.7g/t Au

 

M1 North Prospect

 

  • RC drilling returns 9m at 9.7g/t Au from 112m, incl. 1m at 61.7g/t Au

 

  • Diamond core twin holes to verify RC sampling and provide bulk density confirmed the grade and tenor of M1 North oxide mineralisation with results of

 


- 12m at 2.62g/t Au from 23m and


- 12m at 2.36g/t Au from 21m

 

Feasibility Study

 

  • Progress made on Permitting, Metallurgical Test Work, Mineral Resources and Location of Key Infrastructure

 

Corporate

 

  • $12.5 million placement completed to accelerate drilling program and maiden resource estimation

 

June 2016 Quarter Summary

 

  • 6,130 meters drilled (54 holes)

 

  • $1.38m Exploration and Development Expenditure

 

  • $0.34m Administration Costs

 

  • $11.4 cash at bank at 30 June 2016

 

September 2016 Quarter Plans

 

  • RC and Diamond drilling at M1 and M5

 

  • Resource update M1, M3 and M5

 

  • Feasibility study work

 