Iledor Cuts 8,65 m @ 3,79 g/t Au For Its First Drill Hole
Friday, 27 April 2012 10:00 AM
Val d'Or (Quebec) - March 27, 2012 - Iledor Exploration Corporation (TSX.V: ILE) ("Iledor" or the "Company") The Corporation is pleased to announce analytical results from its first drill hole on its wholly owned ILEDOR property, located on Tiblemont Island south of Senneterre, in northwestern Quebec approximately 40 km northeast of Val-d'Or. Drill hole TIB01-12 is located about 100m south of the old Tiblemont Conslidated shaft. It is drilled with an azimuth of 120? and a plunge of -45?. The NQ caliber hole is drilled to a depth of 423.9 m. The best intercepts are presented in table 1.
----------------------------------------------- |ILEDOR PROJECT | |---------------------------------------------| |Hole |Zone |From |To |Length|Grade | |---------------------------------------------| | | |(m) |(m) |(m) |(g/t) Au| |---------------------------------------------| |TIB-01-12| |92.35 |101.00|8.65 |3.79 | |---------------------------------------------| | |Incl.|92.35 |92.80 |0.45 |7.94 | |---------------------------------------------| | | |92.80 |93.30 |0.50 |0.82 | |---------------------------------------------| | | |93.30 |93.80 |0.50 |8.48 | |---------------------------------------------| | | |93.80 |94.30 |0.50 |2.23 | |---------------------------------------------| | | |94.30 |94.90 |0.60 |31.75 | |---------------------------------------------| | | |94.90 |95.40 |0.50 |1.04 | |---------------------------------------------| | | |95.40 |96.00 |0.60 |0.26 | |---------------------------------------------| | | |96.00 |97.00 |1.00 |0.76 | |---------------------------------------------| | | |97.00 |98.00 |1.00 |0.18 | |---------------------------------------------| | | |98.00 |99.00 |1.00 |0.70 | |---------------------------------------------| | | |99.00 |100.00|1.00 |1.48 | |---------------------------------------------| | | |100.00|101.00|1.00 |0.63 | |---------------------------------------------| |TIB-01-12| |128.10|130.10|2.00 |2.05 | |---------------------------------------------| | |Incl.|128.10|128.60|0.50 |2.98 | |---------------------------------------------| | | |128.60|129.10|0.50 |0.34 | |---------------------------------------------| | | |129.10|129.60|0.50 |4.13 | |---------------------------------------------| | | |129.60|130.10|0.50 |0.77 | -----------------------------------------------
Table 1 : TIB01-12
Core from 92.25 to 101.00m is made of altered granodiorite with quartz-albite-carbonate veinlets, potassic alteration and anastomosed micro-veinlets of sericite. About 2% of sulfides is present. Pyrite being the main sulfide is observed in aggregates of fine crystals or coarser cubes. Traces of galena are also present. More results will be needed to properly interpret which zones have been cut. Three other punctual assays grading between 0,812 and 1,860 g/t Au are observed throughout the same hole. Some intercepts are still open and will require further sampling.
Core logging and sampling is done by D.L. geo-services from Val-d'Or. Analyses are performed by AGAT laboratories in Mississauga by ICP-OES. High grade samples are retested using the gravity method. On top of quality controls done by the laboratory, double, blanks and standards are added by D.L. geo-services.
All technical information included in this press release has been verified and approved by Daniel Lapointe M. Sc., geologist, qualified person as defined by National Instrument 43-101. Mr. Lapointe has over 25 years of experience in production and exploration gold deposits. He is independent of the issuer or all related company.
For further information, please contact Mr. Mario Bisson, President and Chief Executive Officer, at (819) 874-2115 or visit our new website: www.explorationiledor.com
Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. Statements made in this news release that are not historical facts are "forward-looking statements" and readers are cautioned that any such statements are not guarantees of future performance, and that actual developments or results, may vary materially from those in these "forward-looking" statement.
