Happy Creek Drilling Underway at Golden ledge Property
Monday, 20 September 2010 04:02 PM
September 20, 2010 – Vancouver, British Columbia – Happy Creek Minerals Ltd. (TSX-V: HPY, the “Company”) is pleased to announce that drilling is underway on its Golden Ledge property.
During 2010, the Company completed a soil geochemical survey starting approximately 350 metres north of Spanish Mountain Gold’s Thunder Ridge drill hole SC017 that returned 7.5 metres containing 8.84 g/t gold and an additional 9.0 metres of 2.14 g/t gold. On the Golden Ledge property, the soil geochemical survey has identified positive values containing up to 25.0 g/t silver and 1.8 g/t gold and occurs for over 5.0 kilometres on the property. See Press Release dated August 12, 2010. Bedrock samples from the property have returned up to 42.9 g/t gold 34.7 g/t silver over 1.0 metre.
Drilling at Golden Ledge has commenced. The first drill hole (azimuth 270 degrees and dip -45 degrees) is located near the centre of a large silver-gold geochemical anomaly. The first hole is currently at a depth of approximately 150 metres. Several zones of silicification, quartz, quartz-carbonate-ankerite veins, stockwork and several generations of pyrite, locally massive pyrite (iron sulphide) and sphalerite (zinc sulphide) are observed in the graphitic argillite host rock. This geology is thought to be consistent with gold-silver mineralized zones found on the property and general area, and up to nine drill holes are planned in Phase 1.
On the Company’s 100% owned Fox tungsten-molybdenum property, surface trenching is completed in the northern portion of the property. Two widely spaced drill holes were completed in the southern portion of the property, at the Nightcrawler tungsten zone, and one hole was drilled at the far western side of the Discovery moly zone. Results are pending for this work.
On the Company’s 100% owned Highland Valley copper property, drilling is continuing (see Press Release September 8, 2010).
On behalf of the Board of Directors,
“David E Blann”
____________________
David E Blann, P.Eng.
President
David Blann, P.Eng. is a Qualified Person as defined by National Instrument 43-101 and is responsible for the preparation and approval of the technical information disclosed in the news release.
FOR FURTHER INFORMATION PLEASE CONTACT:
Corporate Office:
Phone: 604.662.8310
Email: [email protected]
Website: www.happycreekminerals.com
Investor Relations:
James Berard and Aaron Konkin
Phone: 604-687-2767
Toll free: 1-877-459-5507
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release may contain statements that are forward looking and subject to risk and uncertainty more fully described in the Company’s Prospectus, Financial Statements and Public Filings located on SEDAR.
