Excel Gold Begins Second Phase Drill Campaign at the Montauban Camp.

Thursday, 21 October 2010 09:17 AM

Mr. Martin Harvey reports:

Excel Gold Mining Inc. (EGM, TSX.V) (the “Company” or “Excel”) has received and reviewed the 3-D Gemcom geological model of the mineralized structures of Montauban Mining Camp.

The main objective is of the 3-D Gemcom is to generate precise drill targets for the upcoming 4000 meter drill program, scheduled to begin by the end of the month. Excel has provided a drill program to a shortlist of pre-qualified and pre-selected drilling companies Tuesday.

The diamond drill program will include: Six 100 meters spaced holes over a distance of 2,000 meters, in the Muscocho Ramp area, five holes for 1,000 meters in the «Lens C»; two holes for 800 meters along VLF-EM axis around the possible fault zone, six shallow holes for 150 meters as follow-up of the North Gold Zone trend; two 250 meters over a distance of 500 meters in the «South Gold Zone», and eight holes for 1,000 meters on the «La Traverse» and «Lac des Laurentides».

The drilling program has been planned to provide further information in preparation for a large scope phase 3 drilling campaign.

The targets were generated by the extensive compilation work of the Montauban Mine historical data comprising of:

1)    Uploading and data entry of more than 20,000 assay samples and results from past work, this information was primary for gold, silver, zinc, lead and copper,;

2)    The summary of 975 UG and surface holes including; main units, structures, quartz-rich zones, main foliation or banding measurements;

3)     More than 100 documents filed as assessment work in SIGEOM from which 30 are related to a diamond drilling programs. These drill results were drilled by Anacon (1949-56) , United Montauban (1950-52), Muscocho (1974-90), Soquem (1976-82), Ghislau (1956-65) and, Excel Gold (2009-2010),;

4)    Paper documents including : geophysical surveys, metallurgical tests, technical and economic studies and post-graduate thesis;

5)    The complete plans and architecture of the mine which was acquired by Excel last year.

All of the above historical data was integrated in a data base, feeding the Gemcom 6.2 Software suite. The operation was performed by the Val d’Or firm MRB & Associates, under the supervision of Mr. Jean-Pierre Bérubé, Sr. Geologist, and a team of 5 specialists.

The Company will be posting some of the 3-D Gemcom plans on its new corporate Web Site this week at www.excelgoldmining.com

About Excel

Excel Gold Mining is a Canadian based junior exploration company focused on building shareholder wealth through the acquisition and development of strategic assets in mining friendly jurisdictions, particularly in the province of Quebec.

For further information please contact:

Mr. Martin Harvey

Director, Excel Gold Mining Inc.

(514) 844-8770, #101

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.