EM Resources Inc. Announces Results of the 2006 Exploration Program

EM Resources Inc. Announces Results of the 2006 Exploration Program

Tuesday, 06 February 2007 11:19 AM

EM Resources Inc. announces the results of the 2006 exploration program from the Muskasenda Lake gold project located in English Township, approximately 50 km south of Timmins, Ontario.

 

Gold mineralization is hosted by a zone of quartz-carbonate veining enveloped by chlorite schist containing an average of 10% pyrite, as exposed in numerous historical trenches.

Mechanical stripping was undertaken in the vicinity of the trenches for the purpose of examining the bedrock geology and to facilitate sampling of the vein structures. Grab samples of chlorite schist containing 1-5% pyrite returned assays ranging from 0.09 g/t to 1.17 g/t gold. Quartz vein grab samples containing 2-15% pyrite returned values ranging from 1.27 g/t to 7.31 g/t, gold.

Magnetic and induced polarization (IP) surveys were carried out over 7 kms of survey grid lines spaced at 50 m intervals. The historical trenching responded well to the IP survey displaying a zone of both high chargeability and coincident resistivity.

A limited diamond drilling program was carried out for the purpose of tracing the gold mineralization along strike and down dip. Eight BQ sized holes were drilled for a total of 453 metres. Holes 1, 2, 3 and 5 returned only anomalous gold values. Significant results were obtained in drill holes 4, 6, 7 and 8, as follows:

---------------------------------------------------------------------------
Hole #         Location   From(m)   To (m)   Interval (m)  Gold Assay (g/t)
---------------------------------------------------------------------------
L-06-04     0+75S,0+15E      43.0     45.0            2.0              3.65
---------------------------------------------------------------------------
includes      43.0     44.0            1.0              6.72
---------------------------------------------------------------------------
L-06-06     0+50S,0+25E      40.9     42.3            1.4              2.04
---------------------------------------------------------------------------
L-06-07     0+16S,0+30E      68.5     70.0            1.5              1.55
---------------------------------------------------------------------------
Includes      69.0     69.5            0.5              3.05
---------------------------------------------------------------------------
L-06-08     1+85S,0+35W      17.0     19.0            2.0              1.54
---------------------------------------------------------------------------
includes      18.0     19.0            1.0              2.52
---------------------------------------------------------------------------
23.0     26.0            3.0              1.60
---------------------------------------------------------------------------
includes      24.0     25.0            1.0              3.83
---------------------------------------------------------------------------

True widths of the vein is estimated to be 85 % of the assayed intervals.

All assays were performed by Swastika Labs, utilizing standard fire assay methods. Approximately every tenth sample was re-analyzed to monitor laboratory precision.

Outcroppings and drill information indicate that the mineralized zone can be traced 140m east of the stripped area and 30 m to the west. The deepest drill intersection was hole L-06-08, which intersected the mineralized zone at a vertical depth of 58 metres. The mineralized zone remains untested at depth and along strike.

EM Resources is considering an exploration program to further explore the vein system with additional grid cutting, IP and magnetic surveys followed by a diamond drilling program. Further announcements will be made.

Mr. Gerald A. Harron, P.Eng., is the qualified person responsible for the technical information in this release.

WARNING: No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This News Release includes certain "forward-looking statements". All statements other than statements of historical fact included in this release, including, without limitation, statements regarding potential mineralization and reserves, exploration results, and future plans and objectives of EM Resources, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from EM Resources' expectations are exploration risks detailed herein and from time to time in the filings made by EM Resources with securities regulators.