Dentonia Announces 3.75% Tungsten Tri Oxide Vertical Rock Panel Sample On Stafford Tungsten Project

Tuesday, 03 August 2010 01:21 PM

Dentonia Resources Ltd. (“the Company”) is pleased to announce the results of a vertical rock panel sample taken from the tungsten showing on the 27,754ha Strafford Tungsten Claims.

 

On July 9, 2010, the 91.7kg vertical rock panel sample was taken from the rock face immediately adjacent to the location of the 100kg2 panel sample reported by the Company on October 14, 2009. The vertical sample surface area is 1m2 with a height of 2m.

 

The rock sample material was placed in five pails that were flown to Campbell River by helicopter, then transported by vehicle to Acme Analytical Laboratories (“Acme”) in Vancouver, BC in the custody of James Turner, P. Geo.  The mass weighted average of the 25 assays reported below by Acme was 2.97% Tungsten (W) which equates to a mass weighted average of 3.75% Tungsten Tri-Oxide (WO3) or 37.5kg/t with 0.034% Molybdenum (Mo).

 

Assay procedure

 

Five samples from each pail were crushed, split and pulverized to -200 mesh and assayed by the X-ray Fluorescence/Fusion method.  Twenty-five 250g samples of -200 mesh were roasted to determine the “Loss On Ignition”.  Five grams of the roasted sample was fused in a platinum-gold crucible with a commercial lithium tetraborate flux.  The molten material was cast in a platinum mold.  The fusion disks were analyzed using a Siemens SRS-3000 sequential X-Ray Spectrometer with a chromium tube for W, Mo and Copper (Cu).

 

All elements analyzed were corrected for absorption effect, enhancement effect, line overlap, background correction and Loss On Ignition.  The calibration curves for whole rock analysis were set up using synthetic and commercial standards with certified analytical data.  Every 20 fusion disks prepared included one in-house or commercial standard and one repeat sample.  Every 20 samples analyzed included 2 commercial standards.  The lower limit of detection (or 2 times standard deviation) for whole rock analysis is 0.01%.

 

. . . 2


Vertical Rock Panel Sample X-Ray Fluorescent/Fusion Method Assay Results

 

Sample

Weight (kg)

W (%)

WO3 Equivalent* (%)

Mo (%)

Cu (%)

S-1

21.20

 

 

 

 

1

 

0.75

 

0.02

 

2

 

0.71

 

0.02

 

3

 

0.68

 

0.02

 

4

 

0.70

 

0.02

 

5

 

0.72

 

0.02

 

S-1 Average

 

0.71

0.90

0.02

<0.01

 

 

 

 

 

 

S-2

15.12

 

 

 

 

1

 

3.89

 

0.04

 

2

 

3.85

 

0.04

 

3

 

3.84

 

0.04

 

4

 

3.83

 

0.04

 

5

 

3.86

 

0.04

 

S-2 Average

 

3.85

4.86

0.04

<0.01

 

 

 

 

 

 

S-3

19.80

 

 

 

 

1

 

5.15

 

0.05

 

2

 

5.36

 

0.05

 

3

 

5.28

 

0.05

 

4

 

4.87

 

0.05

 

5

 

5.22

 

0.05

 

S-3 Average

 

5.18

6.54

0.05

<0.01

 

 

 

 

 

 

S-4

17.57

 

 

 

 

1

 

3.50

 

0.04

 

2

 

3.27

 

0.03

 

3

 

3.20

 

0.03

 

4

 

3.21

 

0.03

 

5

 

3.30

 

0.04

 

S-4 Average

 

3.30

4.16

0.034

<0.01

 

 

 

 

 

 

S-5

18.00

 

 

 

 

1

 

2.13

 

0.03

 

2

 

2.09

 

0.03

 

3

 

2.21

 

0.03

 

4

 

1.99

 

0.03

 

5

 

2.20

 

0.03

 

S-5 Average

 

2.12

2.68

0.03

<0.01

 

 

 

 

 

 

Total

91.69

3.03

3.83

0.035

<0.01

Mass Weighted Average

 

2.97

3.75

0.034

 

 

*WO3 = 1.2616 x W

. . . 3


The Stafford Tungsten Claims are located approximately 80km north of Campbell River, BC.  Access is by sea or air to Fraser Bay at the head of Loughborough Inlet. The tungsten discovery is adjacent to a logging road 11km inland from Fraser Bay.

 

The prospective target is at least 164m wide.  The main mineralized skarn is 32m wide.  The main tungsten mineral is scheelite (80.6% WO3). The current price of WO3 is approximately US$24/kg.

 

The Company is planning to start an initial drill program of 1,000m that will take place near the showing and expects to achieve similar results. The drilling will also attempt to demonstrate continuity (down dip and along strike) of the showing. This drilling, if successful, will be followed by a more rigorous drilling campaign of up to 9,000m.  

 

The technical information in this news release was prepared under the direction of James Turner, a Qualified Person as defined by National Instrument 43-101, who has read and approves the information contained herein.

 

For further information, please contact Adolf Petancic, President of Dentonia Resources Ltd. at 604-682-1141 and/or reference the Company’s website at www.dentonia.net.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.