Chilalo Graphite Project: Exploration Target Highlights Significant Resource Growth Potential
Friday, 17 August 2018 05:40 PM
IMX Resources (ASX: IXR, TSX: IXR, IXR.WT) (‘IMX’ or the ‘Company’) is pleased to announce that it has estimated a maiden Exploration Target for its Chilalo Graphite Project in Tanzania of approximately 100–350 million tonnes grading approximately 3-11% Total Graphitic Carbon (‘TGC’). The Exploration Target is in addition to the existing Shimba Mineral Resource (see Table 2, Appendix A).
An Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource. Relevant background to the estimation of this Exploration Target is included in Appendix A.
IMX’s CEO Phil Hoskins said that the Company had calculated an Exploration Target to provide investors, potential customers and other stakeholders with an understanding of the overall scale and longer-term growth potential of the Chilalo Project.
“While we don’t believe that resource size is the key value driver for graphite companies, recent exploration work at Chilalo – including a reassessment of drilling results and geophysical data – had enabled us to establish a more complete picture of the broader potential of the Chilalo Project to emerge as a significant global source of high-grade, coarse flake graphite. This analysis demonstrates that Chilalo has excellent resource growth potential to match that of some of our larger peers,” he said.
Recent electromagnetic (‘EM’) surveys at Chilalo – including Versatile Time Domain (‘VTEM’), Fixed Loop (‘FLEM’) and down-hole electromagnetic (‘DHEM’) surveys – have highlighted a number of high-conductance targets, none of which have been tested by drilling or sampling (see Figure 1).
The high-conductance EM targets correlate very well with high-grade graphite mineralisation at Chilalo (ASX Announcement 28 July 2015). The high-grade Shimba deposit (Inferred Resource of 7.4Mt grading 10.7% TGC for 792,000t of contained graphite (ASX Announcement 7 April 20151) was discovered by drilling similar high-conductance targets identified in VTEM surveys.
|
“The estimation of this maiden Exploration Target, which is based on the considerable exploration work we have already conducted at Chilalo, shows the project has the potential to grow well beyond the scope of the initial mining operation we plan to establish as the first phase of the project development,” Mr Hoskins said.
“The Nachingwea Property is a large, highly prospective 5,800 km2 landholding, attractively located in the graphite-rich Mozambique belt. The tenements on which the Exploration Target is situated represent only 5% of the Nachingwea Property, which gives us great confidence in the potential for resource growth.”
“We believe this Exploration Target will also be viewed favourably by our strategic partners, with whom we’re seeking to complete off-take and finance agreements in the near future.”
The Company is currently focused on moving forward with development of the existing Shimba resource, however there may well be a future need to expand the resource. The timing of the exploration to expand the resource is dependent upon the outcome of the current PFS and development timeline, in addition to demand from the end-users with whom the Company is currently in discussion.
“Our intention is to complete the Pre-Feasibility Study, which is based on a 50,000tpa flake graphite operation at the Shimba deposit, in October 2015 and outline our timeline for fast tracking the project into production. Given that we expect the existing Mineral Resource can support the proposed scale of operation, we don’t intend to immediately define additional resources unless we are seeking to expand production, which will be primarily dependent on demand from the end users with whom we are currently in discussions. The success of our FLEM work gives us a great deal of confidence that high-grade zones can be targeted quickly and cost effectively should an expansion be pursued,” he said.
It is anticipated that low-level exploration activities such as mapping and rock chip sampling would commence during the latter part of 2015 and extend into the 2016 field season. This would be followed by additional FLEM surveys and trenching.
Targets would then be ranked according to size and on assays and petrographic results returned from the rock chip and trenching work. Targets could then be tested by drilling to assess the grade, flake size and geometry of any mineralisation.
PHIL HOSKINS
Chief Executive Officer
|
For further information, please contact: Phil Hoskins – Chief Executive Officer Tel: +61 8 9388 7877
|
Stuart McKenzie – General Manager Commercial and Company Secretary Tel: +61 8 9388 7877
|
Figure 1: Graphite Exploration Targets over Late-time VTEM 1VD Image
To view the graphic in its original size, please click here
Competent Person’s Statement
The information in this report that relates to the Exploration Target is based on data collected under the supervision of Mr Nick Corlis, in his capacity as Executive Director, Exploration. Mr Corlis, BSc (Hons) MSc, is a registered member of the Australian Institute of Geoscientists and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and the activity being undertaken to qualify as a Competent Person under the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Corlis has verified the data underlying the information contained in this announcement and approves and consents to the inclusion of the data in the form and context in which it appears.
About IMX Resources Limited
IMX Resources is an Australian minerals exploration company that holds a 5,800 km2 tenement package at the Nachingwea Property in south-east Tanzania. The Nachingwea Property hosts the Chilalo Graphite Project, the Ntaka Hill Nickel Project and the Kishugu and Naujombo Gold Prospects. IMX’s primary focus is on high-grade, high quality graphite and it is rapidly advancing development of the Chilalo Graphite Project. Chilalo is located approximately 220 km by road from the deep water commercial Mtwara Port, the majority of which is a sealed main road. IMX aims to become a respected supplier of high quality graphite for the clean technology economy.
To find out more, please visit www.imxresources.com.au.
APPENDIX A
Methodology used to calculate the Chilalo Graphite Project Exploration Target
The geometry and grade distribution of the Shimba Inferred Resource was compared to VTEM, FLEM and DHEM data, which correlate well with each other, although there are discrepancies at later EM response times which the VTEM is unable to measure. The high-grade graphite mineralisation is well defined by the high EM conductance targets.
The high EM conductance FLEM and VTEM target lengths totalled approximately 34,500m, which does not include targets outside the Chilalo Project area.
Two sets of Exploration Targets were estimated away from the defined Shimba Inferred Resource; one based on ground FLEM survey data, and the other based on VTEM survey data. The FLEM survey data is higher resolution and therefore gives higher confidence targets.
The FLEM data were modelled, and the high EM conductance modelled target body lengths were measured for a total graphite target trend of approximately 2,600m (excluding the Shimba Inferred Resource).
The high-conductance VTEM targets were selected and measured, producing 30,700m of high-conductance VTEM graphite targets (excluding the Shimba Inferred Resource and FLEM target lengths).
The dimensions of the high conductance VTEM and FLEM graphite targets used were 10-30m thickness based on Shimba drilling, 140m depth extent (along plane of dip – the equivalent of 100m depth as estimated in the Shimba Inferred Resource), and the measured lengths of the high EM conductance target trends.
The dimensions of the high EM conductance FLEM and VTEM graphite targets were multiplied by the average density of 2.5t/m³ to generate an Exploration Target mass, in tonnes derived from densities measured from Shimba core samples.
The Shimba Inferred Resource was used to verify the targeting method of using the FLEM and VTEM data to generate these graphite Exploration Targets.
Substantiating drilling
In 2014, the Company completed 58 holes for 3,810 metres of RC drilling and 7 holes for 554 metres of diamond drilling. In addition to previous drilling conducted in 2014 at Chilalo, estimation of the Exploration Target referred to several holes well outside the Shimba area that indicate that the high conductance EM targets define graphite mineralisation (see Figure 2).
- NRC10-028 – the westernmost of the graphite targets, located 7km west of Shimba. Mineralisation starts at 9m and extends until end of hole at 71m, providing greater than 62m of downhole mineralisation. Logging indicates graphite grading between 5-25% TGC.
- NRC12-111 – drilled 2km to the south of the Shimba deposit on the southernmost limb of the fold complex, this hole intercepted 40 metres of graphite, however no visual TGC % estimate is available.
- NRD12-061 – 4km east of Shimba, logging indicates graphite from 63.7 to 91.3m.
- MBD08-008 – over 150m of graphitic sediments from near surface to end of hole.
- MBD08-009 – over 150m of graphitic sediments from 25m depth.
Anomalies associated with holes MBD08-008 and MBD08-009 are not included in the Exploration Target.
Table 1. Drillhole information: NRC10-028, NRC12-111, NRD12-061
|
Hole ID |
Hole Type |
Location East / North UTM:WGS84 |
Az / Dip |
Hole Depth (m) |
|
NRC10-028 |
DD |
463680.2 / 8899539.7 |
035 / -75 |
100.0 |
|
NRC12-111 |
DD |
472901.864 / 8900105.783 |
360 / -70 |
85.0 |
|
NRD12-061 |
DD |
475402.175 / 8901999.541 |
360 / -60 |
113.7 |
|
MBD08-008 |
DD |
462828.221 / 8891818.758 |
325 / -50 |
175.4 |
|
MBD08-009 |
DD |
463461.504 / 8892328.526 |
325 / -52 |
203.4 |
Figure 2: Chilalo and Mbuti Graphitic targets – Graphite Occurrences in Historical Drill Holes
To view the graphic in its original size, please click here
Assumptions
- Graphite mineralisation at Chilalo extends to at least 100m vertical depth, which is consistent with the existing resource model for the Shimba Deposit. This equates to 140m down the plane of layering in the mineralisation, using a 45° dip.
- Graphite mineralisation varies between 1030m true thickness.
- Graphite mineralisation average density is 2.5t/m³.
- Graphite grade varies between 311% TGC, in accordance with the existing resource model for the Shimba Deposit.
- Anomalous, high EM conductance trends identified in DHEM, FLEM and VTEM data represent graphite mineralisation.
- EM conductors detected in late time decay channels are high conductance, and where drilled, correlate to high graphite grades.
- The high conductance targets identified by the ground FLEM surveys are of higher confidence than those defined by the VTEM data, due to the higher EM transmitter power and longer receiver recording time.
- The axial trend of high conductance graphitic schist layers represents the up-dip edge of un-oxidised, higher grade graphite mineralisation, and the axial trace can be used for estimating the length of the graphite target.
- Many holes drilled prior to 2015 have missed graphite mineralisation, and were not drilled targeting the high conductance targets. Off-hole DHEM anomalies in these drillholes confirm the high conductance targets were not intersected.
Results
- High EM conductance FLEM graphite targets in the immediate vicinity of the Shimba resource are estimated to be 2,600m in length. This equates to a graphite Exploration Target of approximately 9-27Mt at approximately 3-11% TGC (see Table 2 below).
- Remaining high EM conductance VTEM graphite targets have an estimated combined total length of 30,700m. This equates to a graphite Exploration Target of approximately 107-323 Mt at approximately 3-11% TGC (see Table 2 below).
- The total graphite Exploration Target at the Chilalo Project is approximately 116-350 Mt at approximately 3-11% TGC (excluding the existing Shimba resource) (see Table 2 below).
Table 2. Chilalo Exploration Target
|
Shimba Graphite Resource = 18.1 Mt at 6.2 % TGC, including 7.4 Mt at 10.7 % TGC (to validate concept) |
|
|||||
|
Total High Conductance Length (m) |
Thickness (m) |
Vertical Depth (m) |
Down-dip Extent (m) |
Volume (m³) |
Average Density (t/m³) |
Graphite Exploration Target (t) |
|
1,200 |
10 |
100 |
140 |
1,680,000 |
2.5 |
4,200,000 |
|
1,200 |
30 |
100 |
140 |
5,040,000 |
2.5 |
12,600,000 |
|
FLEM Graphite Exploration Target |
|
|
|
|
||
|
Total High Conductance Length (m) |
Thickness (m) |
Vertical Depth (m) |
Down-dip Extent (m) |
Volume (m³) |
Average Density (t/m³) |
Graphite Exploration Target (t) |
|
2,600 |
10 |
100 |
140 |
3,640,000 |
2.5 |
9,100,000 |
|
2,600 |
30 |
100 |
140 |
10,920,000 |
2.5 |
27,300,000 |
|
VTEM Graphite Exploration Target |
|
|
|
|
||
|
Total High Conductance Length (m) |
Thickness (m) |
Vertical Depth (m) |
Down-dip Extent (m) |
Volume (m³) |
Average Density (t/m³) |
Graphite Exploration Target (t) |
|
30,700 |
10 |
100 |
140 |
42,980,000 |
2.5 |
107,450,000 |
|
30,700 |
30 |
100 |
140 |
128,940,000 |
2.5 |
322,350,000 |
|
Graphite Exploration Target Total approximately 116-350 Mt at approximately 3-11% TGC |
||||||
An Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
APPENDIX B. JORC 2012 Table 1 Reporting
Section 1. Sampling Techniques and Data
|
Criteria |
Explanation |
|
Sampling techniques |
|
|
Drilling techniques |
|
|
Drill sample recovery |
|
|
Logging |
|
APPENDIX B. JORC 2012 Table 1 Reporting (cont.)
Section 1. Sampling Techniques and Data
|
Criteria |
Explanation |
|
Sub-sampling techniques and sample preparation |
|
|
Quality of assay data and laboratory tests |
|
|
Verification of sampling and assaying |
|
APPENDIX B. JORC 2012 Table 1 Reporting (cont.)
Section 1. Sampling Techniques and Data
|
Criteria |
|
|
Location of data points |
|
|
Data spacing and distribution |
|
|
Orientation of data in relation to geological structure |
|
|
Sample security |
|
|
Audits or reviews |
|
Section 2. Reporting of Exploration Results
|
Criteria |
Explanation |
|
Mineral tenement and land tenure status |
|
APPENDIX B. JORC 2012 Table 1 Reporting (cont.)
Section 2. Reporting of Exploration Results
|
Criteria |
Explanation |
|
Exploration done by other parties |
|
|
Geology |
|
|
Drill hole information |
|
|
Data aggregation methods |
|
|
Relationship between mineralisation widths and intercept lengths |
|
|
Diagrams |
|
|
Balanced reporting |
|
|
Other substantive exploration data |
|
|
Further work |
|