Charay Gold Project Progressing

Monday, 26 April 2010 07:59 AM

Vancouver, B.C. – JOURNEY RESOURCES CORP. (“Journey” or the “Company”) is pleased to announce a 43-101 report dated March 31, 2010 has been filed by the Company and is available on SEDAR and the company website (www.journeyresourcescorp.com). The qualified person for the project is Phil Van Angeren, P.Geo. The report’s recommendation on the Charay Property is for drilling, in conjunction with additional metallurgical testing, followed by detailed mine planning for an underground mining program involving material from the El Padre vein. Current work on the property will continue, which involves de-watering underground workings and removal of near surface material.

 

The Charay property, also known as "La Mina El Padre", is located at the north end of the State of Sinaloa, Mexico, approximately 36 km northeast of the city of Los Mochis. The property consists of three mining concessions totalling 380 hectares.

 

Geologically, Charay is classified as a low sulphidation, epithermal, gold-silver quartz vein with low base metal content. The pertinent points regarding this property from the 43-101 are as follows:

 

  1. High-grade, near-vertical, epithermal gold/silver vein system within an andesitic volcanic complex (El Padre vein): oxidized, hematitic, low-sulphide, banded quartz-vein and silicified breccia with a prominent silica cap (typical low-sulphidation epithermal features),
  2. Vein width in the order of 1.0 to 2.0m; length in excess of 400m, extending to 50m depths, and open in all directions
  3. Existence of several mineralized and/or silicified structures indicated by workings and geology
  4. Potential for buried bonanza mineralization (indicated by drilling) as well as additional mineralization on strike
  5. Little or no comprehensive historical exploration. Surprisingly under-explored given the high gold grades. No workings reach deeper than 35m, no drilling below ~50m depths
  6. A 27-hole drill program in 2005 intersected a 250 m long mineralized section within 50m of surface on the El Padre vein, at a weighted average of 18.75 gm/T Au and 120.2 gm/T Ag over a true width of 1.14m, recalculated in 2010 at 20.3 gm/T Au and 123.7 gm/T Ag across 1.29m
  7. Location in an area with established mining logistics (eg, access to local mills, mining expertise, railway, powerline, and tidewater port)

 

It has been recommended to initiate feasibility studies on this property in 2010/11, with the goal of ultimately bringing it to full scale production. Feasibility studies will entail a substantial amount of drilling, in conjunction with metallurgical testing, followed by detailed mine planning, if warranted. The currently-defined “bonanza” portion of the El Padre vein will be the prime focus of close-spaced drilling for the initial phases of exploration. In the first phase, fourteen (14) core holes are expected to be drilled on a 50m by 50m grid, to a depth of 100m, in conjunction with preliminary bulk sampling (for metallurgy), at a projected cost of C$500,000.00. Following this, a second phase of drilling is proposed for the higher priority targets defined in the first phase. It too can be completed at a cost of C$ 500,000.00. This first phase preliminary program will initiate a longer-term exploration program directed at:

 

i)                    detailed in-fill drilling of the El Padre vein system,

ii)                  exploration for the extensions to the El Padre vein and for other mineralized veins, and

iii)                feasibility studies and mine planning.

In conjunction with the first phase of exploration, Journey intends to initiate an underground pilot-mining program involving 35,000 tonnes of material from the El Padre vein.

Jack Bal, President of Journey Resources Corp. stated “we are pleased with the recommendations of the report and are working on the commencement of a drill program as outlined in Phase 1 of the 43-101.”

In 2005, Vane Minerals Group (Vane) drilled 27 shallow holes totaling 1,576 meters on the Property. Eight drill holes targeted large zones of intense alteration in search of large-tonnage, low-grade disseminated mineralization. Nineteen drill holes targeted and intersected mineralized quartz veining along a 240 meter strike length of the El Padre vein. Vane estimated a resource of approximately 37,000 tonnes averaging 18.75 gm/T Au and 120.15 gm/T Ag along the 240 meter drill-tested section of the structure, across a width of 1.14 meters and to a depth of 50 meters. The data has not been sufficiently verified by a qualified person under National Instrument 43-101 to be classified as a current resource estimate. Journey is not treating the estimate as a current resource estimate and therefore, this data should not be relied upon.

About Journey Resources Corp.

 

Journey Resources Corp. www.journeyresourcescorp.com is a mineral-exploration resource company trading on the TSX Venture Exchange (Symbol : JNY) and the Frankfurt Stock Exchange (Symbol : JL4). The Company is currently exploring four advanced exploration-stage projects; the Musgrove Gold Project, the Charay Gold Project, the Vianey Mine Silver Project and the Silver Mountain Project.  The Musgrove Project is a prospect for a disseminated gold bulk-tonnage surface project similar to the Beartrack Mine, a nearby former gold producer. The Charay property consists of concessions totaling 380 hectares, located in Sinaloa, Mexico. The Vianey Mine Project consists of concessions totaling 5,022 hectares in Guerrero State west of Mexico City, Mexico. In addition, the Company owns 100% right, title and interest in and to certain mining claims comprising the Silver Mountain Property in Lima, Peru. The Silver Mountain Property is an advanced stage exploration property covering approximately 1,684 hectares, located approximately 75 kilometers east of Lima City and 50 kilometers south of Peru Copper’s Toromocho property and Pan American Silver´s Morococha Mine.

ON BEHALF OF JOURNEY RESOURCES CORP.

 

“Jatinder (Jack) Bal”

 

JATINDER (JACK) BAL

President & CEO

JOURNEY RESOURCES CORP.

For further information on Journey Resources Corp., contact Jack Bal at (604) 633-2442, toll free 1-800-667-1442, e-mail [email protected], or visit our website at www.journeyresourcescorp.com.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

All statements, other than statements of historical fact, included herein are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time with the TSX Venture Exchange, the British Columbia Securities Commission and the Alberta Securities Commission.